Within the scope of the project, the Electricity Distribution Network of 17 villages and towns in Kocaeli province was established.
Within the scope of the project, the 5th Stage of the Kilis Province Electricity Distribution Network Master Project was completed.
Within the scope of the project, 36kV 2x3x1x240/25 XLPE Cable ENH infrastructure works of the Mass Housing Site built by Toki in İçmeler Neighborhood of Tuzla District of Istanbul Province were carried out.
Within the scope of the project, street lighting and decorative and visual lighting works were carried out in the Gaziosmanpaşa District of Istanbul province.
Within the scope of the project, a 2.1 km long Transmission Line with 154 kV 2x1272 MCM conductor was installed for the 80 MVA capacity Geothermal Power Plant established in Nazilli District of Aydın Province.
Proje Kapsamında İstanbul İlinde 154kV/34,5kV 80MVA Trafo Gücünde, 2ad 154kV GIS Hat Fideri, 1ad 154kV GIS Transfer fideri, 36ad 34,5kV Metalclad Çıkış Fiderinden oluşan Trafo Merkezi Tevsiatı işinin tüm Primer Sekonder Elektrik işleri yapılmıştır.
Proje Kapsamında İzmir İli Selçuk İlçesinde Yapılan 154kV/34,5kV 80MVA GIS Trafo Merkezinin 170kV YG Kablo ve Kablo Başlığı Montajları Elektrik işleri yapılmıştır.